Harmonia Mokotów is a residential development worth about €36 million, developed by Dom Development S.A. on Aleja Polski Walczącej in Warsaw's Mokotów district, with around 25,000 m² of net saleable area (NSA).

A five-person PAKA.archi team took over a design the developer had bought together with a final building permit, adapted the apartment and commercial unit mix and layouts to the developer's sales needs, and produced the detailed design for phase III alongside construction by the general contractor. The NSA of Harmonia Mokotów grew by 2% without changes that would have required a new building permit, and phase III was completed in Q4 2025, about 15 months after construction started.

  1. Q4 2023construction start
  2. Q3 2024phase III construction
  3. Q4 2025phase III completion
The phase III building seen from the garden
01 / 04The phase III building seen from the gardenPhoto: PAKA.archi

01 · Key facts

Harmonia Mokotów: developer, scale and scope of work.

  • approx. 25,000 m²net saleable area
  • approx. €36mdevelopment value
  • 5 peoplePAKA.archi team
  • 15 monthsphase III, built while still being designed
Developer
Dom Development S.A.
Development
Harmonia Mokotów, Warsaw
Type
multi-family residential
NSA
approx. 25,000 m²
Starting point
design taken over with a final building permit
PAKA.archi's scope
audit of the inherited documentation, adaptation of the design to the developer's standards, detailed design of phase III, multidisciplinary coordination, handling of permits and approvals
General contractor
Dom Construction
Construction
Q4 2023 to Q4 2025
Status
completed and handed over

02 · Case study

A development bought with its permit in place

Dom Development acquired the site together with a completed design and a final building permit. Buying a design with a valid permit gets a developer on site sooner, but it leaves less room for manoeuvre: the developer's own apartment standards have to fit within what has already been agreed with the authorities.

That was PAKA.archi's task: to bring in the developer's standards and improve the development's return without departing from the permit. Going beyond it would have meant applying for an amended building permit and halting the development for many months.

Archway with the entrance to the underground car park and brick detailing on the ground floor
02 / 04Archway with the entrance to the underground car park and brick detailing on the ground floorPhoto: Szymon Gradowski
Courtyard between the buildings with a playground and greenery
03 / 04Courtyard between the buildings with a playground and greeneryPhoto: Szymon Gradowski

03 · Case study

First, an audit of what had been bought

Before drawing anything, PAKA.archi reviewed the documentation it had taken over. When a design is bought together with the land, this is the only chance to establish exactly what the developer is starting with. Anything missed at this point turns up later on site, by which time it costs money.

PAKA.archi took on dealings with the authorities overseeing the development, so that day-to-day administrative matters stayed off the developer's desk.

04 · Case study

Three changes that fitted within the permit

Dom Development's standards differed from what was in the inherited documentation, and bringing them in within the existing permit gave PAKA.archi the chance to make three changes that improved the development's return.

PAKA.archi adapted the apartment and commercial unit mix and layouts to the developer's sales needs. NSA was increased by 2% without changes that would have required a new building permit. Resized windows and prefabricated balconies reduced the construction cost.

Prefabricated balconies brought the cost down without lowering the quality, and the high design standard Dom Development is known for was fully maintained.

The job also meant being clear about the limits. Whenever an idea went beyond the permit or posed a serious risk to the occupancy permit, PAKA.archi said so straight away. A rejected change costs one meeting. The same change made and then reversed costs three months.

Corner of a building with balconies and ground-floor commercial units facing the street
04 / 04Corner of a building with balconies and ground-floor commercial units facing the streetPhoto: Szymon Gradowski

05 · Case study

A phase that started before its design was finished

Market conditions called for phase III to be brought forward. Construction started in Q3 2024, while the detailed design was still being produced. Any delay on the documentation side would have meant the site standing idle.

When design and construction overlap, coordination takes the most time, so PAKA.archi ran all coordination with the engineering consultants and building services designers in-house. At the same time, the team got to grips with the developer's procedures and set up a way of working with the general contractor.

06 · Case study

Construction never waited for drawings. Phase III was completed in Q4 2025, about 15 months after work began, with the detailed design produced alongside construction. The whole development is now finished: construction ran from Q4 2023, and residents have moved in.

07 · Comment

In PAKA.archi's words.

“The design came to us with a valid permit, so our job was to find extra square metres and savings that would fit within it. Any idea that went beyond the permit would have cost the developer several months.”

Maciej Zaforymski · Partner, senior architect

08 · Photographs

Harmonia Mokotów in 30 photographs.

Photographs of the completed buildings by Szymon Gradowski.

  1. Harmonia Mokotów, Warsaw: photograph 01 from the shoot01
  2. Harmonia Mokotów, Warsaw: photograph 02 from the shoot02
  3. Harmonia Mokotów, Warsaw: photograph 03 from the shoot03
  4. Harmonia Mokotów, Warsaw: photograph 04 from the shoot04
  5. Harmonia Mokotów, Warsaw: photograph 05 from the shoot05
  6. Harmonia Mokotów, Warsaw: photograph 06 from the shoot06
  7. Harmonia Mokotów, Warsaw: photograph 07 from the shoot07
  8. Harmonia Mokotów, Warsaw: photograph 08 from the shoot08
  9. Harmonia Mokotów, Warsaw: photograph 09 from the shoot09
  10. Harmonia Mokotów, Warsaw: photograph 10 from the shoot10
  11. Harmonia Mokotów, Warsaw: photograph 11 from the shoot11
  12. Harmonia Mokotów, Warsaw: photograph 12 from the shoot12
  13. Harmonia Mokotów, Warsaw: photograph 13 from the shoot13
  14. Harmonia Mokotów, Warsaw: photograph 14 from the shoot14
  15. Harmonia Mokotów, Warsaw: photograph 15 from the shoot15
  16. Harmonia Mokotów, Warsaw: photograph 16 from the shoot16
  17. Harmonia Mokotów, Warsaw: photograph 17 from the shoot17
  18. Harmonia Mokotów, Warsaw: photograph 18 from the shoot18
  19. Harmonia Mokotów, Warsaw: photograph 19 from the shoot19
  20. Harmonia Mokotów, Warsaw: photograph 20 from the shoot20
  21. Harmonia Mokotów, Warsaw: photograph 21 from the shoot21
  22. Harmonia Mokotów, Warsaw: photograph 22 from the shoot22
  23. Harmonia Mokotów, Warsaw: photograph 23 from the shoot23
  24. Harmonia Mokotów, Warsaw: photograph 24 from the shoot24
  25. Harmonia Mokotów, Warsaw: photograph 25 from the shoot25
  26. Harmonia Mokotów, Warsaw: photograph 26 from the shoot26
  27. Harmonia Mokotów, Warsaw: photograph 27 from the shoot27
  28. Harmonia Mokotów, Warsaw: photograph 28 from the shoot28
  29. Harmonia Mokotów, Warsaw: photograph 29 from the shoot29
  30. Harmonia Mokotów, Warsaw: photograph 30 from the shoot30

09 · Team

Who worked on Harmonia Mokotów at PAKA.archi?

  1. 01Maciej ZaforymskiPartner, senior architect
  2. 02Kacper MatysiakCo-founder, architect
  3. 03Kateryna PushkarovaBIM architect
  4. 04Liudmila RudzBIM architect
  5. 05Monika Szewczyk-RokickaArchitect, interior designer

10 · Other projects

11 · Contact

Let's talk about your development.

Kacper Matysiak, co-founder and architect, handles new project enquiries at PAKA.archi. For a first conversation, all we need is the site address and the local zoning plan (MPZP) or zoning decision (WZ) that applies to it. If you already have targets, such as a target NSA or the number of apartments, email them to biuro@paka.archi. We reply within 2 working days.

Get in touch